Laserfiche WebLink
UNIFIED IMURAM CONSOLIDATED FORM <br /> UNDE GROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING �lelr�tart __- :Font color:Auto <br /> ;tkat a <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODIS) Formatted:Font COQ:Auto <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49044a. <br /> ® 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> . <br /> LEAK MONITOR MANUFACTUTHE-UDC <br /> ER 490-55. MODEL#4 490 56. <br /> LEAK SENSOR MANUFACTURR. 490-57. MODEL#(S); 490-58. <br /> DETECTION OF A LEAK INTO TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.- <br /> YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-61' <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑ b.NO 490.62, <br /> ---'---- ---._._.._ ...._........._............ ..... .. ..._._.. . ......_._. ___.---- ----- '.--. ..._.._ ......_..... ..... ...... ...... <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE4WALL ❑ 2.DOUBLE WALL lor:Auto Font tb <br /> 490 63. <br /> IF DOUBLE_WALL: ago-64a. <br /> -- -- ._.... __ __ ------._.__ -_. . . ....... .. .. .._ Formatted:Font colo:Auto <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [,� a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-646. <br /> Formatted:Font cobra Auto <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR i2644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: k90.6_8. --- - :Font cola:Auto <br /> ® a.ALARM LOGS ® b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> C3 d. <br /> SIR TESTING RESULTS(and supporting documentation records) E] c.TANK GAUGING RESULTS(and supporting documentation records) <br /> C3 f. <br /> ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ®THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ®OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69.. <br /> ❑STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> ❑SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-698. <br /> 490-69h. <br /> ❑ OTHER(Specify)! 490-69i. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> 'r The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> r The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> D Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> M COMMENTSADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 49041. <br /> Mechanical Flapper at nin five ercent capacft <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that.1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated,and 3.)all monitoring records are mamtamed properly. _ <br /> _ .. ___.. .. .. .. .. .. ..... ... _ .. _ ...... ..... <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Sant Corbin 490-1 TITLE:Chief Engineer 490-73. <br /> NAME: Terrell Estes 490-74 TITLE:Assistant Chief Engineer 490-75. <br /> The DesignatedaUST Operator shall perform a monthly visual inspection of the facility,provide a report to the ownero/petator,.and,inform the owner/operator of any_. _._.-[Formatted:Font color-,Auto <br /> conditions that need follow-upaction. <br /> ------ .. <br /> XII. OWNER/OPERATOR SIGNATURE Formatted:Font color:Auto <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. Formatted:Font:Times New <br /> APPLICANT SIGNATURE DATE: ago-n. Roman Bold <br /> 9/10/2010 �-tted:Font:Times New <br /> RF.PRF,SF.NTPIG 1.'Cauk Oxmer/ for❑2.Facile Ouver/ for 3.Authorized R tative ofOwnQ 490-76. Roman Bold,Font God' Auto <br /> Formatted:Font:Tulles New <br /> Roman Bold,Font cow:Auto <br /> UPCF UST-D(12/2007),X3/3 www.unidocs.org <br />