Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />DoubleTra lexible Double Containment Pi <br />Manual <br />Manufacturer of Flexible Metal Hose and Gas Piping Products <br />DoubleTrac Pre -Installation Check List <br />The following items should be completed before OmegaFlex° personnel arrive on site for training: <br />❑ Two week minimum lead time for OmegaFlex personnel to be on site RECEIVED <br />❑ All existing product removed <br />❑ All ancillary equipment set i.e. tanks & sumps FEB 0 6 Z017 <br />❑ All ground work completed i.e. trenches dug or supports hung <br />❑ DoubleTrac pipe and fittings are on siteLHEALTH <br />i <br />Please fill out the following information: DUARTMENT <br />Contact for DoubleTrac Instal <br />Company Name <br />Telephone <br />Project Name <br />1 — <br />Project Type (circle) UST AST Retail Marina Emergency generator/boiler <br />Requested installation Date <br />Sign <br />Date <br />OmegaFlex, Inc. Confidential Page 1 of 1 03 -Jan -2013 <br />© Copyright 2006 <br />OmegaFlex® 451 Creamery Way • Exton PA 19341 • 800.355.1039 (Fax) 610.524.7284 • www.omegaflex.com <br />