Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: <br />Complete the following checklist: <br />wyas <br />No' <br />Is the audible alarm operational? <br />es <br />F7 NW <br />is the visual alarm operational? <br />es <br />No' <br />Were all sensors visual! Ins ectad, ncOonaN tested, an confirmed.era ional? <br />Yes <br />NW <br />Were all sensors Installed at lowest point of secondary containment an positioned so that other equipment will not interfere with their <br />proper ration? <br />Ly as <br />No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational <br />Lie NIA <br />Eyes <br />e No' <br />For pressurized piping systems, does the turbine automatically. shut down it the piping secondary. containment monitoring system <br />WA <br />s a leak, fails to operator ils electrically disconnected? if yes: which sensors Initiate posi rive shutdown? (Check ail that apply) <br />�-6ump(Tranch <br />San ¢�t �� LJ ispenser Containment Sensors. Did you confirm positive shut -down due to leaks AW sensor <br />failure/disconnection'?, l�'es, LNo. <br />[jYes <br />No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (l.e, no mschanlcal overfill prevention <br />B NIA <br />valve is installed), is the overfill warning alarm visible and audible at the- tank fill point(s) and operating properly? If so, at -what percent <br />of tank capacity does the alarm tri er? 90 <br />es' <br />No <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement ads In Section E below. <br />es' <br />d No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check aN that apply) roduct; ater. If <br />es, describe causes in Section E below. <br />b/ es i <br />U NW <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />�/ as <br />o <br />s all monitoring equipment operational per. manufacturers speciflcations. <br />W in section E pelow, aescriae now ano wnen tnese,aeficiencies were or wni pe correctea. <br />Comments: <br />Monitor Panel Battery Check: 3.69 Volts. <br />Monitor Panel Battery Replaced: [X] Yes [ ] No <br />Monitoring System Certification Page 2 of 4 12/07 <br />