								    				UPCF UST Ope       g Permit Application-Tank Info      . 'on Instructions
<br />    				(Formerly S     CB Permit Application Form B and UPCF Form hwfwrc-b)
<br />  	Complete a separate Tank Information form for each UST for all new permits,permit changes,and any UST system information changes. This form must be submitted
<br />  	within 30 days of permit or UST system information changes, unless your local agency requires approval prior to making changes. For tanks that are part of a
<br /> 	compartmentalized unit_each compartment is considered a separate tank and requires completion of a separate Tank Information form.For a UST closure or removal,
<br /> 	complete only TYPE OF ACTION and Sections I,II,III,IV,and IX.(Note: Numbering of these instructions matches the UPCF data element numbers on the form.)
<br /> 	430.      TYPE OF ACTION-Check the appropriate box to indicate why this form is being submitted.
<br /> 	430a.     DATE UST PERMANENTLY CLOSED-For reporting closure only:enter the date the UST was removed or closed on site.
<br /> 	430b.     DATE EXISTING UST DISCOVERED-Enter the date this UST was discovered.Leave blank if installation date is known.
<br />  	1.	FACILITY ID NUMBER-This space is for agency use only.
<br /> 	3.	BUSINESS NAME-Enter the complete facility name.
<br />  	103.      BUSINESS SITE ADDRESS-Enter the street address of the facility,including building number,if applicable. This address must be the physical location
<br />      		of the facility.Post office box numbers are not acceptable.
<br />  	104.      BUSINESS SITE CITY-Enter the city or unincorporated area in which the facility is located.
<br /> 	432.      TANK ID#-Enter a unique number used to identify the tank. This number may be assigned by the UST owner/operator or the Unified Program Agency.
<br /> 	433.      TANK MANUFACTURER-Enter the name of the company that manufactured the tank.
<br /> 	434.      NUMBER OF TANK UNITS.Check the appropriate box to indicate if the tank is a stand-alone tank or one of two or more compartments in a tank system.
<br />      		A separate UST Operating Permit Application-Tank Information form must be submitted for each compartment.
<br /> 	435.      DATE UST SYSTEM INSTALLED-Enter the date the local agency signed-off on installation of the UST system. This is the date of initial tank system
<br />      		installation,and does not include upgrades or retrofits which may have been performed later.If this is for a new installation,leave blank.
<br /> 	436.      TANK CAPACITY IN GALLONS:Enter the tank capacity. For compartmentalized tanks,enter data for the compartment covered by this tank form only.
<br /> 	437.      NUMBER OF TANK COMPARTMENTS:If the tank is a compartment,enter the total number of compartments in the UST.
<br /> 	439.      TANK USE-Check the type of tank usage.
<br /> 	439a.     If you checked"OTHER"specify the type of tank usage in the space provided.
<br /> 	440.      TANK CONTENTS-Check the specific petroleum or non-petroleum substance stored.
<br /> 	440a.     If you checked"OTHER PETROLEUM"specify the common name of the substance in the space provided[i.e.,the name used in the facility's Hazardous
<br />      		Materials Business Plan(HMBP)inventory].
<br /> 	440b.     If you checked"OTHER"under Non-petroleum,specify the common name of substance in the space provided(i.e.,the name used in the HMBP inventory).
<br /> 	443.      TYPE OF TANK-Check the box that identifies the type of tank.
<br /> 	444.      TANK PRIMARY CONTAINMENT-Check the construction material of the primary containment(i.e.,inner tank wall nearest the hazardous substance
<br />      		stored). If the tank material is not listed,check"Other"and specify the material in the space provided.
<br /> 	444a.     If you checked"OTHER"specify the type of primary containment in the space provided.
<br /> 	445.      TANK SECONDARY CONTAINMENT- Check the construction material of the secondary containment that provides containment external to, and
<br />      		separate from,the primary containment described above.If the tank is a single-wall tank,check"None." If the material is not listed,check"OTHER"and
<br />      		specify the material in the space provided(e.g.,HDPE).
<br /> 	445a.     If you checked"OTHER"specify the type of secondary containment in the space provided.
<br /> 	452       OVERFILL PREVENTION-Check the box(es)to describe the type(s)of overfill protection equipment installed.
<br /> 	458.      PIPING SYSTEM TYPE-Check the type of product/waste piping installed in this tank system. "SAFE SUCTION"refers to piping systems meeting all
<br />      		requirements of 23 CCR§2636(a)(3)(also known as"European Suction"systems)(i.e.,sloped suction piping systems with no valves or pumps below
<br />      		grade and only one check valve,located below and as close as practical to the suction pump). Title 23,California Code of Regulations is available online
<br />      		at www.calregs.com.
<br /> 	464.      PIPING PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)underground product/waste piping.
<br /> 	464a.     If you checked"OTHER"specify the type of primary containment in the space provided.
<br /> 	464b.     PIPING SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(i.e.,secondary piping,trench)
<br />      		provided for the product/waste piping.For single-wall piping systems,check"NONE"
<br /> 	464c.     If you checked"OTHER"specify the type of secondary containment in the space provided.
<br /> 	464d.     PIPING/TURBINE CONTAINMENT SUMP TYPE-Indicate the type of piping/turbine containment sump(s).Check"NONE"if not present.
<br /> 	464e-el.  VENT PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)vent piping. (Note: Address venting of the tank
<br />      		primary containment only.) Specify OTHER type of containment in the space provided.
<br /> 	464f-fl.   VENT SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping,)provided
<br />      		for the vent piping.For single-wall piping systems,check"None." (Note:Address venting of the tank primary containment only.) Specify OTHER type
<br />      		of containment in the space provided.
<br /> 	464g-g1.  VR PRIMARY CONTAINMENT- Check the material(s) used to construct the primary(i.e., inner) vapor recovery piping.  For tanks without vapor
<br />      		recovery piping(e.g.,Diesel tanks),check"None." Specify OTHER type of containment in the space provided.
<br /> 	464h-hl.  VR SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping)provided for
<br />      		the vapor recovery piping.For single-wall piping systems,check"None."Specify OTHER type of containment in the space provided.
<br /> 	464i.     VENT PIPING TRANSITION SUMP TYPE-Indicate type of transition sump(s).Check"NONE"if not present.
<br /> 	464j j1.   RISER PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)piping for all risers(not drop tubes)other than
<br />      		annular space risers(i.e.,risers for filling or gauging of the primary tank). Specify OTHER type of containment in the space provided.
<br /> 	464k-kl.  RISER SECONDARY CONTAINMENT - Check the material(s) used to construct secondary containment system(s) (i.e., secondary piping, sumps)
<br />      		provided for the riser piping.For risers without secondary containment,check"None."Specify OTHER type of containment in the space provided.
<br /> 	45la-c.   FILL COMPONENTS INSTALLED-Check the appropriate boxes to show that spill containment, tank bottom protection,and fill containment sumps(if
<br />      		applicable)are installed.
<br /> 	469a.     UDC CONSTRUCTION TYPE-Check the box to describe the type of dispenser containment system(s)(i.e.,dispenser sumps or pans). If the system has
<br />      		no dispensers(e.g.,standby generator tank system),check"No Dispensers." If the system has a dispenser,but no UDC,check"NONE."
<br /> 	469b.     UDC CONSTRUCTION MATERIAL-Check the box to describe the materials used to construct the UDC.
<br /> 	469c.     If you checked"OTHER"specify the type of UDC construction material in the space provided.
<br /> 	448.      STEEL COMPONENT PROTECTION-All systems contain some steel components. Check the appropriate box(es)to describe all corrosion protection
<br />      		methods used. "Isolation"means electrical isolation from soil,backfill,and groundwater. Examples include fiberglass cladding,non-metallic secondary
<br />      		containment systems which isolate steel components from the sub-surface environment,and insulating bushings.
<br /> 	APPLICANT SIGNATURE-The same person who signs the UST Operating Permit Application-Facility Form shall sign in the space provided. This signature
<br />      		certifies that the signer believes that all information submitted is true and accurate,and that the UST system is compatible with the substance stored.
<br /> 	470.      DATE-Enter the date the form was signed.
<br /> 	471.      APPLICANT NAME-Print or type the name of the person signing the form.
<br /> 	472.      APPLICANT TITLE-Enter the title of the person signing the form.
<br /> 	UPCF UST-B Rev.(12/2007)-2/2   				www.unidocs.org