Laserfiche WebLink
D. Results of Testing/Servicing RECEIVED <br /> Software Version installed: 329.01 V Q 2015 <br /> Com lete the following checklist: <br /> ® YesrE] No* <br /> Is the audible alarm operational? <br /> ® YesIs the visual alarm operational? �IT <br /> ® YesWere all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® YesWere all sensors installed atlowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ YesIf alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sumprrrench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ❑ N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent of tank capacity <br /> does the alarm trigger? 90% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> []Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. comments: fatima on site all passed . cleaned water out of 91 fill sump <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />