My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Describe meth be used for decontamination: • <br />n`=----------------------- ------------------- <br />--------- ---------------------------------- <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />r -.t=- daLLV`----------------------------------------------------- <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name L—brc-A +C�,s-"------Phone(5�O__)_ <br />Hauler Registration #2 <br />L�,'r"�, ('(Cv, <br />Address---------------------------- --- City �–_-- p– M <br />Permitted Disposal Site_���oY__���� <br />7. a. Describe the method that will be utilized to purge and/or inert the piping: <br />��lt'A.er F:l e <br />------------------------------------------------------------------------ <br />b. Piping Hauler: <br />Name-- �=--- --1 rcL5- <br />Address Az <br />5AddressAz AY)th-ev, _/SrUr-ccV,//" gSET J <br />–--------- C��--------Zip ----------- <br />Phone <br />Hauler Registration # (if hauled as hazardous)_ 32'4�_—_ <br />C. Piping Disposal Site: <br />Name— U`�Lvc lL� iZt�fC _ Phone (—" 2.6 2_L4 <br />Address _CACA°\ _S <br />–----------------- city �4cxk •,------- zip q"�33�. ---- <br />EPA IM (if transported to a permitted TSD facility)_ C.I3L0Q I a O ` D <br />8. Is the sampling firm an independent third party from the contractor? YES[] NO [] <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be <br />obtained: <br />Ch1 L%'< v lrY�\% �\�� � '7 �� .r �,�.i(i ��. � b .,�►�5 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.