Laserfiche WebLink
i <br />SWRCB. January 2002 <br />4. TANK ANNULAR TESTING Page 2 of 7 <br />Test Method Developed By: [ ] Tank Manufacturer [ ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [X ] Vacuum [ J Hydrostatic <br />[ J Other (Specify) <br />Test Equipment Used: E ui ment Resolution: <br />.....,u — k ua,,,u„ v„ , upn,rs ,nnue pnur to testing, anu recommenaea loilow-up for failed tests) <br />THIS WAS A RE -TEST AFTER A REPAIR OF A CONDUIT CAUSING FIRST TEST <br />TO FAIL. THIS TEST WAS SUPPOSED TO BE TESTED ON 2.11.03 WHEN WE <br />RE -TESTED SUMPS, WE MISSED TESTING ANNULAR AT THAT TIME. <br />1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems <br />that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, <br />Section 2637(a)(6)) <br />Tank # <br />Tank # <br />Tank # <br />Is Tank Exempt From <br />[ ] Yes [X ] No <br />[ ] Yes [ ]No <br />[ ] Yes [ ] No <br />Testing? 1 <br />Tank Capacity: <br />6000 GALLON <br />Tank Material: <br />Fiberglass <br />Tank Manufacturer: <br />O.C. <br />Product Stored: <br />DIESEL <br />Wait time between <br />applying <br />10 MINUTES <br />pressure/vacuum/water <br />and starting test: <br />Test Start Time: <br />9:00 A.M. <br />Initial Reading (Rl): <br />10 Hg. <br />Test End Time: <br />10:00 A.M. <br />Final Reading (Rf): <br />10 H . . <br />Test Duration: <br />1 HOUR <br />Change in Reading (Rf- <br />-0- <br />R1 <br />Pass/Fail Threshold or <br />NO LOSS <br />Criteria: <br />Test Result: <br />(X l PASS]FAIL <br />Was sensor removed for <br />[ ] YES [X ] NO <br />[ ]YES [ ] NO <br />[ ]YES[ ] NO <br />testing? <br />( ] N/A <br />[ l N/A <br />[ ] N/A <br />Was sensor properly <br />[X ] YES [ ] NO <br />[ ] YES [ ] NO <br />(] YES [ ] NO <br />replaced & verified <br />[ ] N/A <br />[ ] N/A <br />[ ]N/A <br />functional after testing? <br />.....,u — k ua,,,u„ v„ , upn,rs ,nnue pnur to testing, anu recommenaea loilow-up for failed tests) <br />THIS WAS A RE -TEST AFTER A REPAIR OF A CONDUIT CAUSING FIRST TEST <br />TO FAIL. THIS TEST WAS SUPPOSED TO BE TESTED ON 2.11.03 WHEN WE <br />RE -TESTED SUMPS, WE MISSED TESTING ANNULAR AT THAT TIME. <br />1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems <br />that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, <br />Section 2637(a)(6)) <br />