Laserfiche WebLink
SWRCB. January 2002 <br />G�.� ii i111ILII�iif-1[�1 � : � ►I ► ' 1 1Ta <br />Page 7 of 7 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes [ J <br />Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br />Test Method Developed By: [ ] Spill Bucket Manufacturer [ ] Industry Standard [ ] Professional Engineer <br />Other S eci <br />Test Method Used: [ ] Pressure [ ] Vacuum [X 1 Hydrostatic <br />Other (S eci <br />Test Equipment Used: Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between <br />applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading RI): <br />Test End Time: <br />Final Reading (Rf): <br />Test Duration: <br />Chane in Reading Rf-RI) <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result:' f 1 Pass [ 1 Fail 11 1 Pass f ''I Fail f 1''Pass f`' 1 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />IINWAS <br />