My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />ig program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before making <br />the change. Required by CCR 2632 (d) and 2641(h) <br />NAME ,2sFF L DATE <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />lL EGGG o' c� <br />�2�escribe the frequency of performing the monitoring for: <br />TANKS CONT/i✓l�D,t/� - PIPING L'DlVTt�/ S <br />3.Desc ibe the location(s) of where the monitoring will be performed. ie: location of sensors <br />the following equipment for each underground storage tank <br />11 <br />Name and Model of Monitoring Panel <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors <br />Name and Model of Piping Sensors <br />Name and Model of Dispenser Sensors <br />Type of overfill prevention <br />05 Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes 0 NoX <br />Does the turbine shut down if a sensor is disconnected? Yes 0 No Ot <br />Does the turbine shut down is the monitoring panel loses power? Yes 0 NoV„ <br />6. How will the alarm history and subsequent maintenance be recorded? <br />7 aintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? .5 <br />Note: For new installations the secondary containment must be tested 6 months after installation. Al! secondary containment systems <br />must be tested once every 36 months with initial testing performed before December3l, 2003. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. <br />1skrstcmi4c\USTlmonitoringplan.doc <br />1/24/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.