Laserfiche WebLink
SWRCB,January 2002 0PageA of <br /> 6. PRING SLTW TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standardofessional Engineer <br /> ❑Other(Sped} <br /> Test Method Used: ❑Pressure ❑Vacuum 1111ydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: C-4 I Jajell 4ew6r f t em Equipment Resolution <br /> _!�ma _ <br /> X, h '+ k 'W72�r.F <br /> �'� Sump Samp# Sump# amp#. <br /> Sump Diameter: t &0 Ti— <br /> Sump <br /> Sump Depth: 3a t r 3 <br /> Sump Material: % �S� r112ty �s5 <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: � l 13 ti <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: /�e <br /> Condition of sump prior to testing: 40 Y <br /> Portion of Sump Tested' 6' Y �t•>� <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes ❑No XA ❑Yes 0 No STA ❑ es o ❑NA ❑Yes N ❑NA <br /> product and water)?° <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown? ❑Yes ❑No A ❑Yes ❑No A ❑ No ❑NA ❑Yes ❑ o ❑NA <br /> Was fail-safe verified to be <br /> onal?' ❑Yes ❑No A ❑Yes ❑No )XNA 0 Y ❑No ❑NA ❑Yes ❑ o ❑NA <br /> o rati <br /> Wait time betweg <br /> pressure/vacu �w�aterstarting <br /> test <br /> Test Start Time: 11 - 05 1_ 05 l d t 55 <br /> Initial Reading(R): �-C f c(Q Pr v6'� G rC <br /> Test End Time: <br /> Final Reading(RF): F FL.5-F- i',5* 'rr' <br /> Test Duration: 30 In 71res S <br /> 36 <br /> Change in Reading(RF-Ri): Ajo ! • <br /> Pass/Fail Threshold or Criteria: P 3 <br /> Test Result: j2cfass 0 Fail Pass ❑Fail Pass ❑ it ❑ Pass ❑ il <br /> Was sensor removed for testing? es ❑No 0 NA es 0 No ❑NA es ❑No 0 A ❑Yes ❑No ❑ A <br /> Was sensor properly replaced and <br /> verified functional after testing? es ❑No ❑NA Yes ❑No 0 NA Yes ❑No ❑ 0 Yes ❑No 01 <br /> COmments—(include information on repairs made prior to testing, and recommended follow up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SArRCB LG-160) <br />