My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Watertight(WTE)Turbine Enclosures for Fiberglass Reinforced Plastic(FRP)Tanks fro... Page 1 of 2 <br /> • <br /> CHOOSE YOUR INDUSTRY Underground FRP Tanks <br /> Petroleum <br /> Water / Wastewater <br /> Chemical Accessories: Turbine Enclosures <br /> Watertight FRP (WTE) Turbine Enclosure <br /> The Watertight FRP Turbine Enclosure (WTE) body is mounted <br /> on the tank collar. If a leakproof joint is required, cement the <br /> enclosure body to the tank collar using the adhesive kit(Kit AD). <br /> (It is recommended that the joint always be cemented.)All <br /> turbine enclosures are supplied with adhesive kits. <br /> A minimum 36"diameter street box is required with all FRP <br /> • `%b o a i C51 models to allow the removal of the FRP lid after the turbine <br /> o n t a c t r-S 4 enclosure is installed. This also allows the removal of the <br /> • �� manway cover. <br /> • arr. <br /> To leak test the turbine enclosure, use a standing water test. DO <br /> NOT use an air pressure test. <br /> WTE Features: <br /> • Suitable for moderately high groundwater conditions <br /> • Includes an FRP enclosure body(variable length in 12" <br /> increments, 42"or 48" ID) <br /> • FRP reducer(42"x 30"or 48"x 30" ID's)with o-ring <br /> groove and o-ring gasket <br /> • Push-on FRP lid (32.5"OD)with two handles <br /> • Enclosure body is field cemented to the tank collar and <br /> the reducer is field cemented to the enclosure body using <br /> the supplied adhesive kits(Kit AD, two kits required) <br /> • Reducer/enclosure body joint is on the exterior of the <br /> enclosure body allowing easy field installation of the <br /> adhesive without entering the enclosure <br /> • Lid compresses the lubricated o-ring when it is pushed <br /> onto the reducer top, providing a watertight seal with <br /> water up to 12"over the lid <br /> • Lid can be pushed into position by standing on the lid - <br /> made with a non-skid exterior surface <br /> • Lid includes two handles: One is offset to aid in the <br /> removal of the lid and the other is centered on the lid <br /> • 30" opening allows for the removal of a 22" manway lid <br /> (28"OD) <br /> • Enclosure must be vented at all times <br /> http://contaimnentsolutions.com/products/underground_frp/accessories/turbine/WTE.html 12/11/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.