Laserfiche WebLink
D. Results of Testing/Servici - <br /> Software Version Installed: <br /> Copp-fete. the following checklist: A <br /> s ❑ No* Is the audible alarm operational? <br /> aY-q,1 ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visually inspected, functionally tested, and confumed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> ❑ Yes 0X16* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> �N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑ Yes ❑oto* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ( N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes, describe causes,in Section E,below. <br /> [1',Y-6s ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />