Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> .ITNDER DISPENMR�CONT +I I"C)MONITORING <br /> 490-54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> X 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): _---- <br /> ---- - ------- -- — - <br /> PANEL MANUFACTURER: lysca a - <br /> a9o-ss (--MODEL----------------------- - ------- 99956. <br /> —_ --- ROOT #: 'T�+s 3S� <br /> LEAK SENSOR MANUFACTURER: 490-57 MODEL#(S): 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 990-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES ❑b.NO 49"0 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS tk.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490 baa <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [711.LIQUID ❑2.PRESSURE—[]3.VACUUM —_— <br /> ------------------------- -- -- -- -- — <br /> A LEAK WITHIN THE SECOND CONTAINMENT ONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO <br /> 490.646 <br /> ODIC SYSTENI G. r <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.. 23 CCR§2644.1) __— <br /> — ----------- ------- <br /> V2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490 <br /> --------- -66 <br /> ------------------------------ — ---------------------------- ----------------------- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORD] JNG' <br /> The following monitoring/maintenance records are kept for this facility: <br /> JdAlarm logs 490-69a QQ Visual Inspection Records 490-696 ❑Tank integrity testing results 490-69e <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> XATG Testing results(and supporting documentation records).490-69f ❑ Corrosion Protection 60-day logs 490.698 <br /> %Equipment maintenance and calibration records. 490-68h <br /> z. IIX, tA-NING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> �[ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-694 <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69£ <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OTHER(Specify):M69h,M69i <br /> Ut This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Olt MOIJ t-L- Q%fw to­r=W VFq.V 4 WS 00 w Co I S D _ ¢L.APPg& Ser (e 40 20 IA04r. Q,APIW-atTy <br /> XI.4PERSONNEL]RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME PkrJT0 + W P$L#Tgk 490-72 TITLE MOP orGaLmAtJ 490-73 <br /> NAME DPW" .M CA-S 490-74 TITLE 01%JA171ST SS 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XH.tOW?&'R/OE 'T0RSIGNATURE <br /> CERTIFICATI :I 96tify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT I AT 490-76 DATE: 490-77 <br /> Alk, 3� 2 6 24 <br /> REPRES 1.Tank O"er/O rator 2.Facility come O erator 3.Authorized Representative of Owner <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> ><+fJ . cwy fA.S twaat n-bs4✓>< PwALYS'T xc. <br /> UPCF UST-D(12/2007)3/4 <br />