Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer [XIndustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum DKHydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Tape Equipment Resolution: 1/6 in <br /> Spill Box# Gas Spill Box#Diese Spill Box# Spill Box# <br /> Bucket Diameter: 12.5 12.5 <br /> Bucket Depth: 141/4 143/8 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 5 min 5 min <br /> Test Start Time: 9:50 9:55 <br /> Initial Reading(Rj): 141/4 143/8 <br /> Test End Time: 10:50 10:55 <br /> Final Reading(RF): 141/4 131/8 <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 - 1 1/4 <br /> Pass/Fail Threshold or No change No change <br /> Criteria: <br /> iI #1: <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> San Joaquin County sheriffs facility 01/06/2015 <br /> Gasoline fill passe <br /> Diesel fill failed need to replace fill cap and perhaps fill adapter-gasket <br />