Laserfiche WebLink
Nov 12 09 04:57p 20 -367-5424 p.8 <br /> SWRCB,January 2002 Page 7 of 7 <br /> 9. SPILL/Oy#rERFILL CONT ENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure :3 Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill a# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(R-}: <br /> Test End Time: J <br /> Final Reading(RF): <br /> r <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> PasslFail Threshold or <br /> Criteria: <br /> Test-Result:. ❑ :Pass ❑Fail Vass ❑Fail ❑ Pass. OF—ail. ❑ Pass ❑.Fail <br /> Comments—(include information on repairs made prior to testin , and recommended ollow-up for faded tests) <br />