My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> BA LEY ENTERPRISES, INC. <br /> "LIQUID HANDLING SOLUTIONS- <br /> 2370 Maggio Circle,Unit#4,Lodi,CA 95240-8828 <br /> T#: (209)367-4800/F#:(209)367-5424 <br /> Contractor's License#774802 <br /> www.bagleyente�.coca <br /> SITE SPECIFIC SCOPE OF WORK TO ACCOMPANY PERMIT SUBMITTALS TO <br /> AGENCIES HAVING JURISDICTION CONCERNING PHASE H EVR UPGRADES IN <br /> ACCORDANCE WITH CARB EXECUTIVE ORDER VR 201-H(Not including ISD). <br /> Re: San Joaquin County Sheriffs Operation Center located at 7000 Michael Canlis Blvd., <br /> French Camp,CA 95231. <br /> In general,we will comply with all requirements outlined in Exhibit 2 of Executive Order VR <br /> 201-H which contains the installation,maintenance and compliance standards and specifications <br /> applicable to the Healy Phase R EVR System. <br /> 1) Specifically,we will install the following equipment: <br /> One(1)Healy VP 1000 vacuum pump with dispenser interface module and mounting kit. <br /> One(1)Healy electrical installation kit. <br /> One(1)Healy vapor installation kit. <br /> One(1)Healy clean air separator tank. <br /> Two(2)Healy 12"whip hoses. <br /> Two(2)Healy 8'6"product hoses. <br /> Two(2)Healy breakaway valves. <br /> Two(2)Healy EVR approved nozzles,new with black scoff guard. <br /> One(1)Husky Pressure/Vacuum Vent Cap P/N 5885 <br /> 2) We will start up all new equipment for warranty purposes. <br /> 3) We will schedule and coordinate all third-party testing. <br /> 4) We will schedule and ordinate all final inspections with all agencies concerned. <br /> 5) Estimated installation downtime should not exceed three consecutive days. <br /> 6) Expected impact on customer service should be minimal. <br /> 7) Estimated time to completion should not exceed thirty calendar days from start date, <br /> including third party testing and approval by all authorities having jurisdiction. <br /> 8) Estimated project start date will be within thirty days of acceptance of submittals with <br /> estimated completion date within thirty days of start date. The project should be <br /> completed no later than the required date of completion of April 1,2009. <br /> ---Res Res ly submitted, <br /> Jo <br /> General Manager <br /> Atch(s):Exhibit 2 of VR-201-H; Site Plans;Drawings; Spec Sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.