Laserfiche WebLink
Fiber Glass Systems- <br /> r> <br /> f _has successfully completed Bonder <br /> Training as t forth in the SMITH FIBERCAST Total Quality Installation Program <br /> for the installation of UL listed primary and secondary containment products. <br /> Date <br /> Rernevral of the bonder certification is recommended every three years or when <br /> the specific bonding process has not been practiced for a period of 6 months. <br /> Attestation No. P 02883 <br /> Gary Felton <br /> Alpha Petroleum <br /> Attended Installation"Training for EVR Phase I by OPW,Inc. <br /> By Tim Hughes On 7114/2005 <br /> In Dixon. CA Exp Date: 7/14/2007 <br /> Completion of this training course does not create a warranty or guaranty by oPw of your installation <br /> and/or maintenance ofri—les,vapor recovery systems and EVR PHASE!systems This training course <br /> does not eliminate the need to st aly adhere to manufacturer instructions and procedures when <br /> Installing and maintaining nozzles,vapor recovery systems and EW PHASEd Systems All nozzles,vapor <br /> recovery systems and EVR PHASEI Systems must be installed and maintained in accordance with <br /> manufacturer instructions and procedures. <br />