My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:52:58 PM
Creation date
6/3/2020 9:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2009-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:W <br />I <br />other sectionsof the law, but which UST systems arefound to be located within 1000 <br />feet of a well, will be notified pursuant to section 25289, <br />9, subdivision (b) and will be <br />required to conduct testing within 18 months of notification. <br />ELD means a test method that ascertains theintegrity of an UST system. Therefore, <br />regardless of the UST system type (i.e., singie-walled, double -walled, or hybrid 3), the <br />entire UST system (single -walled and doubie-walled) must be tested to fulfill the <br />requirement. <br />What is the process for implementing ELD? <br />As described below, several groups are responsible for various aspects of the process <br />for ELD implementation: <br />SWRCB UST Program Responsibilility: The SWRCB UST Program is responsible for <br />notifying owners/operators of UST systems within 1,000 feet of a public drinking water <br />well that they are subject to the requirements Of ELD.-[Health & Saf. Code,, § 25292.4, <br />subds. (a) and (b) §25292.5, subd. (b); §252 - 89, . subd. _(b); Cal. Code Regs., Tit le <br />' :23, § <br />2640, subd. (e)] The SWRCB UST Program is also responsible for considering requests <br />for reconsideration from those UST owners/operators who believe their facility is not <br />subject to LD. [bal. Code Regs., Title 23, §, 2640, subd. (e)(2)] (See below for <br />additional information on requests for reconsideration.) <br />Owner/Operator Responsibility: Owners/operators of UST systems that meet the <br />criteria for ELD must complete the following steps: <br />• ELD Program Plan ApDroval: Have a written program of ELD (testing program <br />plan) reviewed and approved by the local agency within six (6) months following <br />notification by the SWRCB UST Program. [Cal. Code Regs., Title 23, § 2644.1, <br />subd. (a)(3)], <br />• ELD Test Implementation: Implement the approved program of ELD (testing <br />program plan) at their facility. <br />• For UST systems with a single -walled component, ELD testing <br />must be performed within 18 months following receipt <br />pt of notification <br />from the SWRCB UST Program and repeated every 36 months. <br />[Cal. Code Regs. Title 23, § .2644.1, subd. (a) (3)] <br />• For UST systems without a single -walled component, upon written <br />request by the SW RCB, one ELD test must be performed within 18 <br />months from the date of, notification. [See Health & Saf. Code, § <br />25289(b).] <br />• ELD Test Notification: Notify the local agency at least 48 hours prior to <br />conducting the ELD test unless this notification requirement is waived by the <br />local agency. [1d., § 2644.1,subd. (a)(4)] <br />• ELD Test Result Submittal: Submit the results of the ELD test to the SWRCB <br />USTProgram and the local agency within 60 days after the test has been <br />performed. [1d., § 2644.1, subd. (a)(5)] <br />3 A hybrid UST system refers to a UST system comprised of both single -walled and double -walled components. Because they <br />contain a single -walled component, hybrid UST systems that are subject to ELD must be tested within 18 months of notification and <br />every three years thereafter, unless all regulated single -walled components are upgraded to double -walled. [Cal. Code Regs., Title <br />23, § 2644.1, subd. (a)(1)] <br />California Environmental Protection Agency <br />co Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.