Laserfiche WebLink
S WRCB, January 2002 <br />Page r of 4-- <br />. A ` Secondary Contai0lent Testinb'Report Fair <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested The completed form, written test procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency, <br />1. FACILITY INFORMATION <br />2. TESTING'CONTRACTOR INFORMATION: <br />Corn an NaMe: r,7 tm"f—C7 r" = I <br />Technician Conducting Test: L4 f f V. Vf <br />Credentials: 0 CSLB Licensed Contractor i3 Licensed Tank Tester <br />License Type:. License.Number 7- <br />Manufacturer Training <br />Manufacturer <br />Date Training Expi <br />Component <br />mom <br />mom��', <br />WM <br />O��oi <br />on <br />ommm00 <br />no <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />r <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />of <br />Technician's SiL-nature: C-�! '` €„s'1 /fir, Date: K , <br />