Laserfiche WebLink
S"CB,January 2002 FIECEIVI= D <br /> ; <br /> Page_of <br /> 6. PIPING SUMP TESTING ' 2011 <br /> Test Method Developed By: U SUMP MaM&CUM $t Industry Standard U Protztortal Engineer <br /> U Other(S d ) I <br /> Test Method Used: U Press= U vacuum I k " <br /> U Other ) <br /> Test Eoiinnmu Used: ' mcnt Resolution: <br /> S rp# I lamp# Snmp 0 Sr:mp 0 <br /> Sump Dlametq; 4g" <br /> Sump Depth: 5'- ° <br /> Sump Material: FG <br /> Height from Talc Top to Top of <br /> Highest PipingPencmdon: 24" <br /> Height from Tank Top to Lowest <br /> Electrical Penebation: 34" <br /> Condition of priarto testing; <br /> Portion of Sump Testedr <br /> Does ttubitta Sind down when <br /> swig sensor detects Ugmd(both U Yes U No idNA UXes UNo UNA U Ves Ui io UNA UYes UM UNA <br /> tvduct end Mate ? <br /> Twbine shutdown response time <br /> ss w?programmed for fail-We UYes UM RNA Utes UNo UNA Utes UNo UNA. UYes UNo UNA <br /> Was -safe verified to be UYes U No 19 NA UYea UM UNA <br /> tiormi?° UYes UMUNA U Yes U No UNA <br /> Wait time Dara app <br /> piamr/vamwWwater and starting <br /> 30 Minutes. <br /> Test Start Time <br /> Initial Reading ft: <br /> TestEnd Time: <br /> Final Reading(Rr►): 5.5504 <br /> Test Duration: IS Minutes <br /> Change in Reading(III-R& D 0 ° <br /> PmMail Threshold or Criteria: ' <br /> Teat Result: A TATS D Fail 13 Pass D Fail 0 Pass D Ra! D Pass 0 Fail <br /> Was settlor removed fortesting7 KYes' U No UNA UYes UM UNA UYes UNo UNA. UYes UM UNA <br /> Was sensor properly replaced and <br /> Q( <br /> vet�dfimcflonalafter Yes UNo UNA UYes UNo UNA UYes UNo UNA UYes UNa UNA <br /> Comments-include information on repairs made prr1or to.tesdnA,mrd recommended�ollow-up r,(atled tests) <br /> If the entire depth of the sump is not tested-spec*how much was tested. V the answer to aU of the questions indicated with an <br /> asterisk(o)is°'NO"or"NA",the entire sump must be tested. (Sae SWRCB LG•160) <br />