My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8WBCB,January 20O2 Page ___of <br />Comments — (include information on L52airs made prior to testing, and recommende!�fbllow-up forfailed tests) <br />Facility is Not Equ�ppe(LWith Spill/Overfill Containment Boxes- 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />JV Spill Bucket Manufacturer D Industry Standard 0 Professional Engineer <br />Test Method Used: <br />0 Pressure 0 Vacuum <br />jp Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Visual <br />Equipment Resolution: <br />an- BMW <br />On <br />111,01 VWINN MINE <br />-- <br />Spill Box # 5&6 <br />Bucket Diameter: <br />I Bucket Depth: <br />I <br />Wait time between applying <br />11 pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF) - <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Comments — (include information on L52airs made prior to testing, and recommende!�fbllow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.