Laserfiche WebLink
6 <br />SWRCB, January 2002 <br />Page 3 of 8 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: U Piping Manufacturer IA Industry Standard U Professional Engineer <br />U Other (Spec) <br />Test Method Used: SCI Pressure U Vacuum U Hydrostatic <br />U Other (Specify) <br />Test Equipment Used: Pressure a es Equipment Resolution: <br />Plnlne Run # 1 Pining Run # 7 Piping Run # Piping Run # <br />Piping Material: <br />Fiber lass <br />Fiberglass <br />Fiber lass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />ee <br />ee <br />ee <br />Length of Piping Run: <br />1001 <br />e <br />e <br />Product Stored: <br />1 hr. <br />Ile <br />Method and location of <br />piping -run isolation: <br />Erom inside <br />o inside 12ip <br />d'sp pan <br />sump SAME <br />Same <br />Wait time between applying <br />pressure/vacuum/water and <br />startingtest: <br />i hr. <br />hr. <br />hr. <br />7 est start t sme: <br />1 1: 3 U <br />1 'I : 3 U <br />I I• 3 U <br />Initial Reading (R,): <br />4.5 PSI <br />4.5 PSI <br />4 5 PSI <br />Test End Time: <br />12: 3 0 <br />12:30 <br />Final Reading (R,;): <br />4. 5 PSI <br />4.5 PSI <br />4. 5 PSI <br />Test Duration: <br />1 hr. <br />1 - hr <br />Change in Reading (RH Re): <br />Pass/Fail Threshold or <br />Criteria: <br />0 Loss <br />0 Loss <br />0 Loss <br />Test Result: <br />LX Pass U Fail <br />V Pass U Fall <br />Lk Pass U Fall U Paas U FA <br />Comments —(include information on repairsrnade <br />prlor•ta letting; and recommended follow-up forfalled tests) <br />