Laserfiche WebLink
Jan 28 03 07:50a <br />01/14/2003 11:22 <br />Rob Robertson 209-772-3179 p.2 <br />2e94*3 FIFTH FLOiIR <br />4ATJTTEN MONITORING AND RUPONSE PLAIN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit bolder must notify Environmental Health Department. (209) 46$-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a perrnit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME KI € ort % 7(o DATE L— = 0 <br />FACILITY ADDRESS (e-33 S&2 a.'k A Vic-ro as R Q4• 2 2-qQ <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />`'�t'c.-rte' <br />2.Descnbe the frequency of performing the monitoring for: <br />TANKS PIPING <br />3.Describe the location(s) of where the monitoring will be performed. ie.' location of sensors <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel \1rE= i t0 <br />Name and Model of Line Leak Detectors S�«�-^ <br />Name and Model of Annular Sensors 1SJ�1� <br />Name and Model of Piping; Sensors <br />Name and Model of Dispenser Sensors 11 <br />Type of overfill prevention 5® <br />5 -Do the Turbine Sensors and Dispenser pan Sensors shut down the turbine? Yes 0 NO '- <br />Does <br />Does the turbine shut down if a sensor is disconnected? Yes 0 No O <br />Does the turbine shut down is the monitoring panel loses power? Yes 0 No 0 <br />6. How will the alarm history and subsequent maintenance be recorded? AAnq) <br />a R Y e j <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? a..) :1 i - — <br />Note: For new installations the secondary containment must be rested 6 months after installation. All secondary containmenr system's <br />mut be reacd once every 36 months -irh inirtal test(ng performed before January 1, 2003 <br />8, Describe thtrai n cess for the operation of UST system, including piping, and the monitoring; <br />equipment. I; ++ S <br />l:\nutemi-tctU5'f�rcwnimringplan.d ut <br />?n 4!atmz <br />