Laserfiche WebLink
-0/133/2002 05:18 19163728834 <br />sH.,,ELD, HARPER i3 CO, PAGE 05 <br />Executive Order VRr1Q2-A <br />Exhibit 1 <br />Figure 1A <br />OPW Phase I Vapor R®covery System Equipment List <br />Gotati(a.:iirtiCaliriu#GE'uter";A.clxnbet` <br />; <br />Spill Containers and Figure 2E <br />OPWROMEGO <br />1.2100 Series <br />Covers <br />1 C-2100 Series ��r <br />I EC -2100 Setles <br />Replacement Drain Figure 2F <br />OPW <br />1 DK -2100 <br />Valve Kit <br />Gasket Seal Adaptor Figure 213 <br />OPW <br />FSA -400 <br />Rotatable Phase 1 Figure 2H <br />OPW <br />61SALP-EVR (product) <br />Adaptors Figure 21 <br />61VSA-EVR (vapor) <br />Installation Tool Figure 2,1 <br />OPW <br />61 SA -Tool <br />Dust Caps Figure 2K <br />OPW <br />634TT-EVR (product) <br />1711T-EVR (vapor) <br />Drop Tube Overflil Figure 2t- <br />OPW <br />61 SO--EVR Series <br />Prevention Device' <br />61JSK-4400-EVR—Pf <br />Jack Screw Kit Figure 2M <br />OPW <br />Tank Bottom Figure 2N <br />OPW <br />6111-1400 (optional) <br />Protector <br />Tank Gauge Port Figure 20 <br />Morrison Brothers <br />305XPA Series Tank Monitoring <br />Components <br />Cap and Ring Kit <br />Pressure/Vacuum Figure 2P <br />Husky <br />Model 4885, 2 -inch Threaded <br />Vent Valve <br />' Ball float vent valves are not certified for installation of this system in new faclllties (including those <br />undergoing major modifications). <br />opW Fueling Components - Phase I Vapor Recovery System — VR -1 02-A <br />