Laserfiche WebLink
Facility Name: Norms 76 / 8 / 01 <br />— ate ut i estmgiServtctng: <br />D. Results of Testing/Servicing <br />Comnlete the fnitnwine rhaetttlef- <br />5P Yes <br />(❑ No* <br />Is the monitoring system o crational per manufacturer's specifications? <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />0 Yes <br />❑ No* <br />Is the visual alarm operational" <br />® Yes <br />❑ No* <br />Were all sensors visually inspected. tested and confirmed operational? <br />W Yes <br />❑ No* <br />Were all sensors and probes reinstalled ro erl ? <br />0 Yes <br />❑ No* <br />Is all monitoring equipment secured from unauthorized tampering? <br />❑ Yes <br />❑ No* <br />IX N/A <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />operational? <br />0 Yes <br />❑ No* <br />If needed by any monitoring equipment, are replacement fuses and/or batteries available? <br />❑ N/A <br />❑ Yes <br />CK No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ❑ Yes; ❑ No. <br />❑ Yes <br />❑ No* <br />IX N/A <br />For monitoring systems that also serve as tank overfill warning devices, is the overfill warning alarm visible <br />and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity does the <br />alarm trigger? %, <br />❑ Yes* <br />lk No <br />Was any monitoring equipment replaced? If yes, identifyspecific sensors <br />P ,probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes <br />QC No <br />Was any s stem software u graded? If yes, identify the new version number in Section E, below. <br />❑ Yes* <br />❑{ No <br />Was liquid found inside any secondary containment systems? (Check all that apply) ❑ Product; ❑ Water. If <br />es, describe causes in Section E. below. <br />-• �. �.•..•.., vcavn' Ucacg Avc BMW ARAU Bruen u►ese ueuceenc►es were or will be corrected. <br />E. Comments: Test all impact ( Shear) Valves -All O.K. <br />12 Total <br />Page 3 of this Certification must be completed and attached only if one or more of the following conditions arc filet: 1.) rn- <br />tank gauging equipment is used to perform leak detection monitoring; 2.) Line leak detectors are installed on piping systems: <br />3.) Completion is required by your local agency that regulates UST systems. <br />CALd1-01 I'a e 2 <br />l+ Oa <br />