My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10-23-19% 11:16AM FRU4 WDOLSEY OIL. INC 209 948 0755 <br />Po" , Fax Nole 7697091h, <br />P- I <br />Na d Pagm JImre <br />F -- <br />:N TAL HEAL Th <br />NAP: <br />C—Ple- lAir-6 f --Vg- A4eOt'< -4A' tem ;"6- <br />*464�'X <br />Woolsey Oil Co. Project: <br />166 Frank West Circle Norms BP <br />Stockton CA 633 East Victor Rd. <br />Lodi CA <br />Johnson Petroleum Construction Inc. conducted the following <br />performance testing at NQ -8)? 633 East Victor Rd. Lodi CA on July <br />17, 1996 <br />Veeder coot `ILS 250i to gauge and monitor system. <br />For tanks # 1, 2,3; Piping sump liquid sensors alarm and clear as <br />intended by manufacturer. <br />Brine filled annular space sensors alar and clear as intended by <br />manufacturer. <br />Capacitance probes print volume and ullage within parameters set <br />by manufacturer. <br />All fill caps anal adapters in good working order, tight fitting and <br />gaskets in place. <br />All phase 11 coaxial vapor recovery drop tubes operate and sea] <br />property. <br />All fill spill containment sumps in good working order including <br />drains to to <br />Bravo dispenser drip pans installed and working properly. <br />'k 1, <br />'a c3u�— <br />Scott D. Johnson <br />JPC Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.