My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />A ill..� l <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name <br />Facility Address <br />A. Describe the frequency of performing the monitoring: <br />Tank <br />Piping <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank <br />Piping <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the names) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />E. Reporting format for monitoring: <br />Tanis <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.