My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f i NEW UST INSTALLATION RECORD <br />FACILITY NAME "DI 7EXRn <br />FACILITY ADDRESS (D-3-5 E\I Ir k Lo i I <br />SWEEPS # �5�� TANK # U.L. # PRODUCTy�l <br />DATE I APPROVED I DISAPPROVED I RENS I ITEM OR EQUIPMENT INSPECTED <br />2 1+1 1. UST INSTALLATION PLANS SUBMITTED & FEES PAID <br />7lw ICS 2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTION <br />PIPING STAGE INSPECTION <br />�3 <br />1. HOLIDAY TEST (PLASTEEL) <br />I. PRESSURE TEST (10 AND 20 PSI (FRP)J I ✓ : 5v 5 , Z '' -6 5 <br />2. AIR TESTED @ 5 PSI (FRP) <br />l / <br />`t 3 V <br />3. VISUAL INSPECTION OF 20 CONTAINMENT <br />?i q <br />% 6 <br />4. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING STAGE INSPECTION <br />�3 <br />I. PRESSURE TEST (10 AND 20 PSI (FRP)J I ✓ : 5v 5 , Z '' -6 5 <br />2. BALL FLOAT VALVES INSTALLED <br />% 6 <br />3. OVERFILL PROTECTION INSTALLED, DESCRIBE: /-0n?'/dAAI1'4� <br />4. UNUSED TANK OPENING SEALED & CATHODICALLY PROTECTED <br />3. PERFORMANCE TEST OF OVERFILL PROTECTION SYSTEM <br />S. VISUAL INSPECTION OF 20 CONTAINMENT ON PIPING <br />4. PERFORMANCE TEST OF PRODUCT LINE LEAK DETECTOR (HARD <br />6. MONITORING PORTS IN PLACE & BROUGHT TO GRADE (LOCKABLE <br />WEATHER PROOF COVERS) <br />? �{ <br />7. FILL & VENT PIPING BROUGHT TO GRADE <br />5. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM(S) ON <br />8. PRODUCT LINE LEAK DETECTOR INPLACE (HARD WIRED) <br />TANK(S) <br />9. APPROVED UST LEAK MONITORING DEVICE INSTALLED <br />6. PERMIT TO OPERATE APPLICATION COMPLETE <br />10. ALL GALVANIZED PIPING & FITTINGS PROPERLY WRAPPED <br />7. ACCEPTABLE RECORD KEEPING SYSTEM <br />11. PRESSURE DECAY TEST ON COMPLETE UST & PRODUCT DELIVERY <br />SYSTEM <br />FINAL INSPECTION <br />1. PRECISION TEST SUCCESSFULLY COMPLETED AND HARD COPIES <br />RECEIVED (NFPA 329) <br />% 6 <br />2. SPILL PROTECTION AT FILL PIPE <br />3. PERFORMANCE TEST OF OVERFILL PROTECTION SYSTEM <br />4. PERFORMANCE TEST OF PRODUCT LINE LEAK DETECTOR (HARD <br />WIRED) <br />5. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM(S) ON <br />TANK(S) <br />6. PERMIT TO OPERATE APPLICATION COMPLETE <br />7. ACCEPTABLE RECORD KEEPING SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.