Laserfiche WebLink
` PUBLIC HEALTH - SERVICES <br />PgUly <br />SAN JOAQUIN COUNTY r.' •� <br />JOGI KHANNA M.D., M.P.H. ": I.;r X <br />Health Officer <br />P.O. Box 2009 . (1601 East Hazelton Avenue) . Stockton, California 95201 <br />(209) 468-3400 <br />TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br />San Joaquin County Public Health Services -Environmental Health Division (PIII-EHD) has <br />established the following guidelines to assist you in the completion of your e6nstruction <br />project. The guidelines specify the construction and monitoring criteria necessary to <br />complete our review of your proposed underground storage tank (UST) system. <br />1. SUBMITTAL OF PLANS <br />a. Submit 4 complete sets of detailed drawings in non -erasable ink to the <br />Environmental Health Division. Upon approval, one set will be retained by <br />the department and the other three will be returned. <br />b. Include equipment and material specification sheets and manufacturer's <br />brochures describing operating and monitoring systems and listing numbers or <br />other evidence of a nationally recognized testing organization approval. <br />C. Include detailed monitoring and response plans for facility. <br />d. The drawn to scale plot plan should illustrate the location of all existing and <br />proposed structures, including existing UST(s). <br />e. The plans should include a cross sectional diagram of the tank and piping <br />system including secondary containment, overflow protection equipment, <br />extension of all pipes, and ports from subgrade to finish grade. <br />2. PLAN REVIEW AND OPERATING PERMIT FEES <br />a. New facility plan review fee of $30, operating permit application fee of $100, <br />$50 fee per tank, plus $56 state surcharge fee per tank is due at time of plan <br />submittal. <br />b. New installation of additional tank at existing facility is $30 plan review fee <br />plus $50 fee per new tank, and $56 per tank state surcharge fee. <br />C. The maximum review time for UST installation plans is 40 working days. A <br />preliminary review will be conducted by the PHS/EHD within 20 working <br />days of submittal date to identify any gross plan deficiencies. <br />d. If gross deficiencies are identified, the plans will be returned with checklist <br />identifying; plan deficiencies. <br />e. It should be noted that a $30 plan review check fee required for each <br />submittal allows for up to two hours of staff review time. Additional time <br />spent on plan review, meetings, inspections, phone or office consultations will <br />be billed to the applicant at a rate of $35 per hour. <br />f. To expedite the review of installation plans, a $52.50 per hour overtime fee <br />may be submitted to have review completed within 10 working days of <br />submittal date. <br />A Division of San Joaquin County Health Care Services <br />