Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br />NA A. Steel -clad with fiberglass reinforced plastic. <br />NA B. Holiday test required immediately before "setting" tank(s) (35,000 - <br />40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />A (1) Striker plate dimensions and materials. <br />A (2) Striker plate under all accessible openings. <br />A -1 (3) Installation instructions require air testing and soaping <br />prior to installation. <br />NA D. Non -clad steel tank [Section 2635 (b)] <br />N A (1) Cathodic protection provided for entire tank, piping and <br />components (nuts, bolts, washers, etc.). <br />NA (2) Approved by a corrosion engineer or N.A.C.E. <br />technician. <br />N A (3) Document stating inspection method and frequency <br />(minimum semi-annual inspection requirement). <br />N A E. Other types of tanks. <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection systems (detail drawing of spill catchment basins)/piping <br />sump(s) required). [Section 2635 (b) (8)] <br />r - <br />G A. Spill catchment basin. <br />5 <br />Capacity <br />OK <br />Type. <br />CJ6 ®121 2 <br />5 <br />