My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />U <br />Universal)1212 fill spill catch basin <br />Emco . • , <br />C = EMCO A-89-001 coaxial fill vapor adapter <br />Di pipe , pl <br />galvanized pipe risff <br />F = OPW 61 SOP coax overfill prevention valve <br />with •, tube <br />r • �. •. <br />Hydrostaticmonitor <br />I Hydrostatic monitor probe <br />monitor , <br />K = Electric J -box, GRSS type <br />L = Conduit sealing fitting <br />= 3/4" conduit to monitor panel in bldg. <br />N =16" manhole CNI <br />O = Veeder Root 'TLSI-250 probe <br />P = Tokheim 585A-34 3/4 hp submerged pump <br />with Red Jacket 216-004 piston leak detector <br />Q = Owens Coming TE42-3 42" turbine encosure <br />(piping sump) <br />R = 2" x 24" Theflex flex connector <br />S = 3" fiberglass secondary containment pipe <br />°ade <br />of slab <br />4' <br />by <br />Oil Equipment Service <br />P.O. Box 950 <br />San Andreas, CA 95249 <br />(209) 754-1808 <br />Note: Concrete slab over tanks to <br />extend 24" beyond extremities of <br />tanks in all directions. Slab over tanks <br />and drive slabs to be reinforced as <br />follows: #4 bar continuous 6" from all <br />edges; #3 bars 18" o.c. both ways <br />throughout (see detail Slit. 8) <br />T = 2" fiberglass product pipe <br />U = Piping sump sensor <br />V = Universal V420 vent extractor valve <br />W = 2" fiberglass vent line <br />X = 3" fiberglass phase II vapor line on center <br />(Regular) tank with 2" loop over to other 2 tanks <br />with high point minimum 24" above tank. <br />Y = Piping sump manhole cover <br />Z = 30" piping sump access manhole <br />Cross Section of Tanks <br />Proposed Service Station <br />for <br />ox's Texaco Food Mart <br />633 E. Victor Road <br />Lodi, CA 95240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.