My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_1991-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2004
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_1991-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M storing System Certification <br />Site Address: 1960W. 11TH STREET Date of Testing/Service: 06/04/2003 <br />F. In -Tank Gauging / SIR Equipment Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Q Yes <br />❑ No * <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Q Yes <br />® No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Q Yes <br />F-1 No * <br />Was accuracy of system product level readings tested? <br />❑Yes <br />❑No * <br />Was accuracy of system water level readings tested? <br />X Yes <br />❑ No * <br />Were all probes reinstalled properly? <br />Q Yes <br />❑ No * <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Q Yes <br />❑ No * ❑N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: E] 3 g.p.h ® 0.1 g.p.h E]0.2 g.p.h <br />F-1 Yes <br />® No * <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />X Yes <br />[]No- <br />Was the testing apparatus properly calibrated? <br />Q Yes <br />M No * Q N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Q Yes <br />❑No * ❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 Yes <br />❑No * ❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />0 Yes <br />❑No * ❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ Yes <br />❑No * ❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />[:]No * <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.