Laserfiche WebLink
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD 3 g <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B <br /> • <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. C1l IRp11M1� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: SS © - 3 a 3 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNER'S TANK 1.D.# Z I <br /> B. MANUFACTURED BY: r <br /> C. DATE INSTALLED(MO/DAYNEAR) 2— 1 D. TANK CAPACITY IN GALLONS: OD O <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A. X1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. <br /> ❑ to REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ <br /> 1b PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT lc MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF(Ai)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF z 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL �3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING � 6 UNLINED E] 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL P ENTION EQUIPMENT INSTALLED(YEAR) <br /> E.SPILL AND OVERFILL,BtC. <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES_rG NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A(:UA FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MECHANICAL LINE LEAK 2 TIM <br /> r xn� 4 ss 3 CONTINUOUS IMUMTMAL ELECTRONIC uNE 5 AuTOMAnC PUMP ❑ 99 OTHER <br /> DETECTOR ❑ iESTI1Ni MONITORING LEAK DETECTOR SHUTDOWN <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 RECO CILIATIONNUAL ORY ❑ 3 MOONIITORING 4 GAUD NG AUTOMATIC TANK ❑5 MONITORINGTER ❑6 TESTINGANNUAL <br /> 7CONTINUMONITORU INTERSTITIAL ❑ 8 SIR ❑ 9 TANK LY MANUAL ❑10 MO TINLY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE T OF MY KNOWLEDGE,IS TRUE ANDORRECT <br /> TANK NAME DATE <br /> (PEED d SIGNATURE) <br /> 8 <br /> LOCAL AGENCY USE ONLY THE STATE NU ER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> C UNTY JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# a. <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED.FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> FORM B (6-95)SHOULD BE ACCOMPANIED BY A PLOT PLAN. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UGROUND STORAGE TANK REGULATIONS <br /> •I f v1 v. <br />