My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_1991-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2004
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_1991-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIP ENT TEST LOG <br />S/S #: BUSINESS NAME: <br />Address: <br />CONTRACTOR: <br />Nome of person completing tests: <br />Signoture: <br />Deoler°s Signoture: <br />Check off each test when performed: <br />1. ❑ Sheor Volve Inspections - Dote: <br />Fill out this <br />form for <br />eoch onnuol <br />inspection <br />and keep <br />on file. <br />2. ❑ Leck Detector <br />Product <br />Model Leok Full Line Pressure PSI Simuloted Line Leck Test Inspection <br />Detector Open Mox. 12 Close Min. 26 Pass Foil Dote <br />e ulor <br />upreme <br />Unleaded <br />Unleaded <br />iesel <br />Cher <br />3. U Dispenser Meter Calibration Procedure: <br />1. Before Storting colibrotion runs. wet the colibrotion con with product <br />and return product to storage. - <br />2. Run 5 gollons with nozzle wide open into the con. Note gollons and <br />cubic inches drown. and return product to storage. <br />3. Run .5 gollons with nozzle one-holf open into the con. Note gollons <br />and cubic . inches drown and return product to storoge. <br />4. If the volume meosured in o 5 -go -lion colibrotion con is more thon <br />6 cubic inches obove or below the 5-gollon mork. the meter requires <br />colibrotion by o registered device repoirmon. <br />Fost Flow Slow Flow Vol. Returned Colibrotion <br />Dote/Time Nozzle # Product 5 -Gal. Droft 5 -Gal. Draft to storage Required? <br />Gal. Cu -In- Gal. Cu.ln: gallons YES*/NO <br />I =Note dote of Colibrotion & Device(s) used: <br />auW-o+w <br />02-03-91 <br />Chevron <br />
The URL can be used to link to this page
Your browser does not support the video tag.