My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_1991-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2004
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_1991-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/13/96 2 <br />N.W. REGION ANNUAL RETAIL PACILITY CRITICAL EQUIPMENT INSPECTION REPORT <br />.... R..........ENERAL <br />................:::................... . <br />1 <br />Verify each nozzle dispenses less than 10 gallons per minute. <br />2 <br />Are all the meter adjusting mechanisms sealed? <br />3 <br />Are the dispenser solenoid valves operating correctly? <br />DISRENSER PROBE <br />1 <br />Is the dispenser sump probe functioning correctly? (pull each probe and <br />manual) test) <br />JDISPENSER <br />- IMPACT VALVE <br />1 <br />Does the impact valve open and close easily, anchored to the island, and <br />within 112" of rade? <br />2 <br />Does the impact valve stop all product flow when closed? <br />�r <br />3 <br />Is there a vapor shear valve installed and anchored? (effective 1995) <br />K <br />BUILDING .AND POINT EIGHT -:EMERGENCY SHUT DOWN SYSTEM <br />1 <br />Does the Emergency Shutdown System function i.e. <br />correctly does it <br />shutdown the turbine when activated at the point eight panel and remote <br />�- <br />locations? <br />L <br />BUILDING - CATtifJDIC PROTECTION <br />1 <br />Is the system found operating (green light on)? <br />M <br />BUILDING - COMPRESSOR RECEIVER / RELIEF VALVE <br />1 <br />Are compressor belts properly guarded and in good condition? <br />2 <br />Does the compressor show signs of excessive oil leaks? <br />3 <br />Compressor recovery rate within acceptable limits? <br />l <br />4 <br />Is the pressure relief valve operable? <br />:N <br />BUILDING - HOISTS <br />1 <br />Is there a permanent hoist ID plate in place with rated capacity, <br />manufacturer, model number, serial number on each hoist? <br />E <br />2 <br />Does the hoist operate correctly i.e. no erratic movements in raising or <br />lowering mode, unit fails to maintain elevation when in raised position, <br />failure of safety locking devices to function as designed, malfunction of <br />lift controls? <br />3 <br />Are the following free of defects and in serviceable condition: the bolster, <br />bolster connections, lifting arms and pads, lift control devices, oil <br />reservoir level, cylinder packing, wire ropes, synchronizers, locking <br />devices, overall hoist condition? <br />4 <br />Vehicle positioning means such as locating ribs, positioning dishes, or <br />floor markings, must be used with frame or axle engaging lifts? <br />2/13/96 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.