Laserfiche WebLink
Ao <br />NITOR SYSTEM CEION <br />TANKNOLOIFIC <br />Test Date: 03/29/2001 Work Order #: <br />2216071 <br />Client: CHEVRON, U.S.A. Site: CHEVRON STATION <br />#201383 <br />P.O. BOX 6004 1960 W. 11TH STREET <br />SAN RAMON, CA, 94583 TRACY CA 95376 <br />Overall System Operation <br />The pumps; Shut down automatically if the system detects a leak, fails to operate, or is <br />electronically disconnected. <br />[ ] Yes [ X ] No <br />The system has functioning audible and visual alarms. <br />[ X ] Yes [ ] No <br />The circuit breaker for the system is properly identified. <br />[ X ] Yes [ ] No <br />The system is certified operational per manufacturer's performance standards. <br />[ ] Yes [ X ] No <br />Product Tank Monitoring: [ ] Double wall [ ] Single wall <br />Make: VEEDER-ROOT Model: FLOAT <br />Type: HYDROGUARD SYSTEM How many: 3 Operational: <br />[ X ] Yes [ ] No <br />(Automatic tank gauge, annular space vapor probe, annular space liquid probe, hydroguard system, <br />vadose zone monitor well, groundwater monitor well) <br />Comments: <br />3 IN TANK PROBES. CERT OPERATIONAL. <br />Product Piping Monitoring: [ X ] Double wall [ ] Single wall <br />Make: VEEDER-ROOT Model: PLLD <br />Type: ELECTRONIC LINE How many: 3 Operational: <br />[ ] Yes [ ] No <br />(Piping sump liquid sensor, piping trench liquid sensor, electronic line pressure sensor, <br />mechanical line leak detector) <br />Comments: <br />REG UNL PLLD WILL NOT DETECT 3 GPH LEAK <br />Other Monitoring Systems: <br />Make: VEEDER-ROOT Model: FLOAT <br />Type: SUMP LIQUID SENSOR How many: 6 Operational: <br />[X ] Yes [ l No <br />Comments: <br />DISPENSER PAN SENSORS. <br />Technician: ANEU, CHAND Technician Signature: <br />