Laserfiche WebLink
FACILITY <br />SUEEPSS --, G <br />NEW UST INSTALLATION <br />Y <br />� �i� <br />a <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUJM: SMP: PSY: /HYO: �® <br />PRIMARY TANK TEST: PSI: <br />TANK APPROPRIATELY PLACED WITH APPROYED I&ACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRINE(LtCUID ANNULAR): OTHER: <br />HRS/HIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />f� <br />A <br />I <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />8. LAID: TEST ON ALL SUII (24 HR. MINIMUM) NRS: (CCR 2635 (A)) <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />R <br />0 <br />1 I <br />OMFILL PROTECTION INSTALLED/ <br />E <br />0 <br />L <br />S <br />TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />ILI <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />MONITORING PLAN, RESPCIRSIE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />// ✓ <br />-I FORM COMPLETED AIS SMITTED <br />(CCR 2635 (E)) <br />/> <br />1. UST PLANSSUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />LL <br />�AILI <br />UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />a <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUJM: SMP: PSY: /HYO: �® <br />PRIMARY TANK TEST: PSI: <br />TANK APPROPRIATELY PLACED WITH APPROYED I&ACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRINE(LtCUID ANNULAR): OTHER: <br />HRS/HIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />f� <br />PERFORMANCE TEST FOR •ALL• MONITORING PROBES <br />PRIMARY PIPING TEST (MINIMUM 40 PSY/30 MIN) / (CCR 2635 (8) (4)) <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />SECONDARY PIPING CONTAINMENT TEST PSI: 1� NRS/NIN: OTHER: (CCR 2635 (A) (4)) <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />8. LAID: TEST ON ALL SUII (24 HR. MINIMUM) NRS: (CCR 2635 (A)) <br />®UNUSED <br />PERF CE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />BALL FLOAT VALVES INSTALLED <br />ZLIV OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />OMFILL PROTECTION INSTALLED/ <br />1. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (8)) <br />COMMENTS: -- - <br />EH23-006 3/42 <br />F <br />PERFORMANCE TEST FOR •ALL• MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 co) 2635 (8) (5)) <br />PERF CE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2635 (8) (5)) <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (8) (6)) <br />OMFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />pAL <br />TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />ILI <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />/ <br />MONITORING PLAN, RESPCIRSIE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />// ✓ <br />-I FORM COMPLETED AIS SMITTED <br />(CCR 2635 (E)) <br />/> <br />ITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />ALL CONDITIONS MET; FACILITY PERMIT I <br />(H+S CODE 25284 (E) (F)) <br />COMMENTS: -- - <br />EH23-006 3/42 <br />F <br />