My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_1991-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2004
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_1991-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PLAIN REVIEW GUIDELINES <br />a. The enclosed plan review sheet is provided for your information to assist you <br />in interpreting our requirements for your new UST system. <br />b. A copy of the California Underground Storage Tank Regulations may be <br />obtained from the State Water Resources Control Board at (916) 739-4332. <br />C. Permits and/or plan check approval may also be required by the San Joaquin <br />Air Pollution Control District, County/City Building Department and Fire <br />District in your respective area. <br />d. Complete and submit the State Water Resources Control Board "Facility (A)" <br />and "Tank Permit (B)" application forms. <br />e. A minimum of 3 inspections will be conducted on the UST system installation. <br />A $ 5 aper hour inspection fee may be charged for additional inspections or <br />reinspection as required. <br />f. Applicant/contractor to adhere to the approval plan and any change or <br />deviation shall be reported and approved by PHS/EI-ID prior to installation. <br />g. Field inspections associated with the plan review process shall be scheduled <br />(48) hours in advance. <br />If you need further assistance, or wish to schedule an appointment to discuss the plan review <br />or field inspection, please contact our Underground Storage Tank Staff at (209) 468-3420. <br />OA <br />
The URL can be used to link to this page
Your browser does not support the video tag.