Laserfiche WebLink
LIMED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-I. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) Q O O O O 0 1 <br /> 111 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Chevron Station#201383 <br /> BUSINESS SITE ADDRESS 1960 W. 111h St. 103. CITY Tracy 04. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel;[7.3 ccR§2632,2634.2638,26411 <br /> EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> a90-3a. <br /> MONITORING E <br /> Q ( P •J): 490-36. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED (23 CCR§2632,26341 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) r ahak all <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> a PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 9. MODEL#(S): 794390-407 490-10. <br /> _..---- -.....---..__...._.... _ ......_....-............... ...................................-.._......-- --._._._...__..._._..--._........................._ _ ......_.._.__..........................................................._.._._.......__..........-..._ _._... <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-I5. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS .DAILY/NIGHTLY Lj c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18. <br /> g.p.h. g.p.h. (Specify): a90 19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ..........--,-- _-._..............................._.-.................._..................................._.........................._ _.........................._-......_..---- ...__..................._......_..-_-._................._._._......-........................_-....._.-_..._.............-..................................................._F- <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[i3 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490.9202 21 <br /> ...............................-,._..................................................._....---......-...__-..._........__.. -.__.... _.._.....__.-................................................................................ --..._..._.... ----._.-.-_.....-_._..........................-...........................................................:....__. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci a90 20-. <br /> TEST FRE <br /> Q (Specify): a90-7.s. <br /> ❑ 99.OTHER(Specify): 49a90-7.6. <br /> 427. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check <br /> all <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-21. <br /> [23 CCk SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL#(S): 794380-208 490-33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ❑ . MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY VPERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38. <br /> ........................_...,.........._......................... <br /> ----.-...-. -. _...-....._......--.... _.-..... <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S):PLLD#848480-003 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ® a.MINIMUM MONTHLY 0.2 g.p.h. ® b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES El b.No 490-44. <br /> ........................................................---- -.........-- __.......__.................................................................................................................._.. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49047. <br /> ..............................._:----.............._....._............................................................._.-_... --_......- --.._...._......_....._.._.........................................._.....-.......-...._............._._..--- ......._........_ <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for monitorin of unbuned emer enc enerator fuel m onl er HSC 25281.5 3 <br /> .......................__.- ............_....._........__............._ ...................................................................................--..._..........._.. ----...._.......- ....__....__..._...............&.................__.._._-........6........YB.................................P..P.....F.........YE.............._�_....... -ro)().._............_._.. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] 490-50. <br /> .... ......................................._..........._.._.._.............-........_......--- -- _ -......_...._.........._................................................................................................._.-.._..__... -------.....-._.............-.......................__................_._................................. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> _ ._._-......................._.... - <br /> . <br /> 49 <br /> ❑ 99.OTHER(Specify) a90-s7.. <br /> 0-53. <br />