My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Onitoring System Certification <br /> Site Address: 1960 W. 11TH STREET Date of Testing/Service: 02/27/2009 <br /> F. In-Tank Gauging /SIR Equipment <br /> Check this box if tank gauging is used only for inventory control. <br /> E] Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> El Yes ®No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> EYes Q No* Was accuracy of system product level readings tested? <br /> Q Yes ❑No* Was accuracy of system water level readings tested? <br /> _FX_1 YesNo• Were all probes reinstalled properly? <br /> ❑x Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No* [—]N/A (Check all that apply)Simulated leak rate: 0 3 g.p.h❑0.1 g.p.hE]0.2 g.p.h <br /> x Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FX-1 Yes ❑No* Was the testing apparatus properly calibrated? <br /> F]Yes ❑No* Q N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> M Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> 0 Yes ❑No* ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> M Yes No* ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> L'_I Yes ❑No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.