My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />NOV 04 2015 <br />UST SYSTEM RETROFIT OR REPAIR - ENVIRONMENTAL <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by E ITN n=40TAmur <br />1. Site map enclosed? YES ;( NO [] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />CONVERT EXISTING 91 UST TO DIESEL, CONVERT EXISTING 89 TO 91 UST. <br />REMOVE AND REPLACE EXISTING DISPENSERS AND UDC'S <br />INSTALL 6 NEW MULTI -GRADE DISPENSERS WITH HANGING HARDWARE. <br />INSTALL 6 NEW DW UDC'S <br />RE INSTALL 208 SUMP SENSORS IN UDC'S, INSTALL NEW 209 SUMP SENSORS IN STP SUMPS AND FILL SUMPS <br />AND PERFORM COLD START OF TLS -050 <br />INTALL NEW PLLD 1N TURBINES PART # 848480-003 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />INSTALL NEW DRESSER-WAYNE OVATION B-12 DISPENSERS WITH FACTORY INSTALLED HI -HOSE RETRACTORS AND ISD FLOW <br />METERS. INSTALL NEW DRESSER-WAYNE OVATION B-23 DISPENSERS WITH FACTORY INSTALLED HI -HOSE RETRACTORS AND <br />ISD FLOW METERS. <br />INSTALL NEW VEEDOR ROOT 209 SUMP SENSORS. <br />INSTALL NEW D/W UDC'S WITH NEW PENETRATION FITTINGS. <br />PLLD PART NUMBER 848480-003 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.