Laserfiche WebLink
E <br />F -SERIES -D <br />Adhesive <br />Injectioi <br />Port alway., <br />installed a <br />12 'o-clocl <br />Dual test <br />ports at <br />9 and 6 <br />`o -clock <br />WEI: <br />FITTINGCT 13 2015 <br />ENVIRONMENTAL <br />HEATH nPD60TAMCKIT <br />The F -Series -D entry fitting has two test / <br />drain port locations. One at 9 'o -clock and <br />one at 6 'o -clock. This allows installers to <br />choose the position that is compliant with <br />their local regulatory requirements. <br />Primary passes <br />through fitting for <br />testing, while not <br />permanently installed <br />After primary passes <br />testing, the primary <br />is then sealed to the <br />fitting by adhesive <br />injection <br />The secondary is then <br />sealed and tested. <br />RECOMMENDED TOOLS FOR INSTALLATION: Refer to Instruction Manual <br />T -FS -SAND -GUN Sanding Gun (5/8") <br />T -FS -SAND -KIT Steel disc set for fittings <br />T -FS -SAND -KIT <br />T -FS -SAND -GUN <br />0 BRNVO <br />WWW.SBRAVO.COM <br />4P <br />made <br />in <br />Ccr�if�'�d <br />WENC <br />- <br />r�(-'TE <br />PROBLEMSOLVEO <br />800 -AT -BRAVO <br />U <br />USA <br />F M BE'R <br />