Laserfiche WebLink
0 <br />B.6- Close off ball valve completely and <br />prime the open ended 36" length of clear tubing <br />with provided Interstitial Fluid. A liquid funnel is <br />recommended. <br />0 <br />Filling Bravo Systems Double Wall Products with <br />Brine (saline) solution will void the product warranty. <br />only Bravo -Supplied Interstitial Fluid. <br />AIR <br />Gauge <br />Barb & � <br />Ball Valve <br />Assembly <br />Liquid Source: <br />Bucket filled <br />with Interstitial <br />Fluid. <br />You must use <br />B.7 - After filling the tubing all the way to the ball valve, insert open end into your liquid source. <br />(5 gallon bucket filled with fluid is recommended.) <br />B.8 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches <br />of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system. <br />...SLOWLY open ball valve... <br />B.9 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF <br />THE INTERSTITIAL SPACE / TEST PORT. This is easily visible while filling the DoubleWall <br />Product. <br />8 ii -B8000 -9000 -DW -11B <br />