My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AW <br />October 1, 2015 <br />San Joaquin County Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, CA. 95205 <br />ATTN: Ms. Cindy Vo <br />RE: Chevron —1960 W. 11th Street, Tracy, CA. 95376 (SR0073163) <br />This letter is in response to your letter dated September 24, 2015 with additional information and <br />update. <br />1. Primary Containment- Provide Cut Sheets and independent testing organization listing for the <br />following: <br />a. OPW shearvalves G tTSf-LEETS PROVIDED ON9/2 /2025 <br />b. Fireflex Flex connectors C�TSI t> ETS P2oVlp�p oN9!�i�o2s <br />c. Product piping. PROVIDED WITH- THIS RESPONSE LETTER. <br />2. Secondary Containment — Provide cut sheet and Title 23 2631(d) documentation (independent <br />testing organization or equivalent) for the following: <br />a. Bravo UDCs CI,LTSI-I-EETS PROVIDED ON9/2 /2015 <br />b. Bravo penetration fitting F -32 -TS -D PROVIDED WITf-t ThflS RESPONSE LETTER. <br />3. Provide cut sheet for leak detectors. CI,tTSf-fEETS PROVIDED ON9/2 /2015 <br />4. Indicate how the double walled UDCs will be monitored, if you are installing double walled <br />UDCs. If not, please update the list of equipment with accurate information. There will be V'ew <br />doubLe walled I,tDCs but the ntov'Ltorwog s�stevw wLLL vi,ot be nAoWfbed. EKLstw9 Lut ,Cs are <br />Vvtovutored wain a Veedor Root 208 I,IDC seosor avud WELL continL-te do so Cn the MW double <br />WaLLed I,IDCs. <br />5. Technician certifications PROVIDED ON9/27/2o25 <br />6. Complete application <br />a. For page 2 line leak detectors were not mentioned in the scope of work. A REVISED <br />SCOPE OF WDRfC IS PROVIDED WITH Tf-tIS RESPONSE LETTER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.