Laserfiche WebLink
Apr 08 05 10:34a Bagley Enterprise c (209 X67-5424 p.5 <br /> UST Monitoring Site Plan <br /> CALXFbRt-=R S"M? <br /> . . . . . . Regular Tank Premium Tack Diesel Tank <br /> Wrap-Amuod Aimtftr 0 0 Tank 5ensers: <br /> . . . . Coaxial Fill 0 0 L1 Regulw Sump . <br /> L2 ReguLm Annular <br /> . . . . . . Tank LAPM Probe O q L3 Super sump <br /> . , _ _ , , La Super Annular <br /> L5 Ojesel Sump <br /> . . . Vemeder Root LO DRwAH Annuiar <br /> Panel in ofd TuT#aine sump (� ! <br /> LO— <br /> . . Quick G Dispenser 382 <br /> . . . . iinstapvd under ( only one wilt► <br /> Diesel) <br /> r 18,2 Sensor L.9 <br /> Dispenser 3&4 <br /> Sensor Li0 <br /> Dispenser 586 <br /> sensor Ll 1 <br /> Dispenaw 7&8 <br /> . . . . Sensor L12 <br /> Datc map wtv drawn cx revisoJ: Q+ld 7/Z+005 <br /> instructiiong <br /> Tf you already have a diagram (e.g- your F arardous Materials Business Plan Site Plan/Storage Map) which <br /> shows all required information, you may includc it, rather than this page, with this monitoring plan. On your <br /> site plan,shove the general layout of tanks and piping in relation to nearby buildings or other structures, CIearty <br /> identify locations of the following equipment, if installed: monitoring system control Weis; mccbanical or <br /> electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under-dispenser <br /> containment, or other secondary containment areas; and, if ATG is required, in-tank liquid level probes. In the <br /> space provided,note the date the drawing was prepared_ <br /> [IN 422A-STS rv1Y�.un i�usx qep� Rev,t ivi-DS <br />