My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:34:08 PM
Creation date
6/3/2020 9:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\2224\PR0232555\PERMANENT INJUNCTION 7-19-07.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Nov 41 11 08: 05a Elite IV Contactors 12094616342 p. 4 <br /> SWRCB,January 2002 Page j of-2- <br /> 6. PIPING SUMP JESTING <br /> Test Method Developed By: D Sump Manufacturer 47Industry—Standard~ 0 Professional Engineer <br /> :1 Other(Specify) <br /> Test Method Used: nressure. 0 Vacuum 0 Hydrostatic <br /> 0 Other cify) <br /> Test Equipment Used:Equipment Used: rient Resolution: <br /> SUMP#ar SUMP a Sum I SUMP# <br /> Sump Diameter: <br /> 5 <br /> Sump Depth: 6 <br /> Sump Material: %- <br /> Height from Tank Top to Top of <br /> Highest Pi inPenetration: -Z <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> -Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects01 Yes (03 No eZ NA <br /> liquid(both 0 Yes 0 No 0 NA 0 0 No 0 NIA 0 Yes 0 No 0 NA <br /> 2roduct and water)?* <br /> Turbine shutdown response time — <br /> Is system programmed for fail-safe 0—Yeso No 7NA <br /> shutdown?* 0 Yes 0 No ---NA 0 If u 11 No 0 NA 0 Yes 0 No D NA <br /> Was fail-safe verified to be 0 Yes 0 No 77NA <br /> 9�erational?* -Yes 0 N DNA ova 0 N DNA DYes 0 N DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(R,): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail:Threshold or Criteria: <br /> N <br /> RN_ ;TRW u5i <br /> Was sensor removed for testing? 0 Yes 0 0 NA 0 Yes 0 No D NA Yos -1.1 No NA Yes 0 No 0!NA <br /> Was sensor properly replaced and :1 Yes 0 No INA <br /> Lverified functional after testip 0 Yes 11 No 13 NA o Ycs tlNo DNA J 0 Yes 0 No DNA <br /> Comments— information on repairs made prior to testing and recommended fi+h -2iupjbrfailed tests <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer toar of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.