Laserfiche WebLink
4 <br /> r -In addition to the submersible pump problems encountered without an in-line check valve, <br /> the metering portion of.the_teak_detector is hammered by hydrautic shock. This results in <br /> i` many teaks.going undetected. Those[eak detectors are dust not equped for the job you <br /> purchased them for <br /> The 99 LD-2000 is.the-answer_youu have been lookjng_for. Vil.leak detectors, with an inte- <br /> grated check valve_an.ti_pressure re ie_vawew} save_money-and reduce customer frustra- <br /> tion at the dispenser and:reduce service calls_ <br /> The 99 W-200-0, <br /> Has A Higher LeveC OfPerformance Over A-broader Range of Burial Depth, Line Length, <br /> And Piping System Types Than_Any Other Leak Detector <br /> Additional Features <br /> • Over 20% increased flow capacity; <br /> Guaranteed'for 24 months from-date:.of insiattation to detect 3 GPH C10.PSI leak <br /> • One .Way'Poppetfto <br /> • Reverse Ratio Piston /� .oppefcom fnation <br /> • Smatter Volume --Faster.#Respons �pttm-s z-e- <br /> ..::.. :.. . . <br /> • Shortest.profile leak detector-avaaiubte-for "tigh " installations <br /> • Aft.::f..uels�(gasolineL:::�dieset.-;,-atco-ioL) <br /> �. <br /> Alt-pipe luaes`(flexi.ble tibergta5s steel up to 40® ml z resiliency <br /> • Exceeds EPA regulations 3 GPH'0_1 6 <br /> PSl <br /> • Detects leaks up to 10' above the leak detector <br /> Installs with 2 1/16" six point socket or pipe wrench' <br /> Increased Flow Capacity <br /> The 99 LD-2000 has maximized theltow and flow path in existing, older submersible pump <br /> heads. This new.desigri atlows over 20%more'flow than previous LD -2000 models, maximiz- <br /> mg-:pump performance:for earlier..pump heads: <br /> Longest Guarantee <br /> .. . 99.1-D 2000 shares the_longestguran <br /> atee available m t-he Industry, alori with all other <br /> VMI`99 LD-2000 renes teak detectors.'l=dr 24 month ' -`ot` date of installation, the LD-2000 is <br /> _ _ _ _ <br /> guaranteed to see <br /> : :. <br /> --- -_.. -_ .:,. <br /> The ane 1Nay Poppet:FCow Pat :9solates ppmp tufbt tence`Frorr�-lme leak detection at pump <br /> does-noel — -. <br /> thermal conditions-.encountered.dunpg-station::operation,:(precision metering change is <br /> insignificant-down-to::20qw :�� <br /> "Patent pending . .. . ...m....._.:,..,. <br />