Laserfiche WebLink
CONIPLWNCE <br />Alk <br />PIC Compliance Systems, LLC <br />P <br />1001 Bayhill Dr, Suite 150■ San Bruno, CA 94066 ■ Contractor Lic. #880430 <br />EEE -700 -EPIC ■ Fax 415-296-6110■ www. epiccompliance.com <br />Site Name California Stop Date 03/17/2010 <br />Site Address 2224 S Manthey Stockton CA 95206 <br />Test Information <br />Comments: LLD was replaced by E-4 with permit. <br />-This letter certifies that the leak detector test(s) were performed at the above referenced facility. according to the <br />equipment manufacturers procedures and limitations and the results as listed are to my knowledge true and correct. <br />The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: EPIC Compliance Systems, LLC <br />Technician: Keith Huston Signature: <br />Date: 03/17/2010 Time: <br />1 <br />2 <br />3 <br />4 <br />5 <br />Product <br />Regular <br />Premium <br />Diesel <br />Manufacturer <br />VMI <br />VMI <br />VMI <br />Model <br />99 LD 2000 <br />99 LD 2000 <br />99 LD 2000 <br />Resiliency <br />95 ml <br />- <br />1800 ml <br />Opening Time <br />3 sec <br />- <br />3 sec <br />Test Leak Rate (ml/min) gph <br />3 gph <br />- <br />3 gph <br />Metering PSI <br />20/34 <br />- <br />18/28 <br />PASS / FAIL <br />Pass <br />Fail <br />Pass <br />Comments: LLD was replaced by E-4 with permit. <br />-This letter certifies that the leak detector test(s) were performed at the above referenced facility. according to the <br />equipment manufacturers procedures and limitations and the results as listed are to my knowledge true and correct. <br />The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: EPIC Compliance Systems, LLC <br />Technician: Keith Huston Signature: <br />Date: 03/17/2010 Time: <br />