Laserfiche WebLink
State Water Resources Control Board Amk Page 1 of 2 <br />Home >> Water Issues ••3> Programs >> Ust >> Leak Prevention >> Lg113 >> Vendors <br />UST Programs - LG 113 <br />....-.... ............... --- ............ ................... <br />,,.,...,......,..........,....... <br />Issue Date: August 23, 1999 <br />Revision Date: March 11, 2004 <br />Vaporless Manufacturing <br />Vaporless 98LD-2000, 99LD-2000, 99LD-2200, LD -2200 Scout <br />(for Rigid and Flexible Pipelines) <br />Certification Leak rate of 3.0 gph with PD = 100% and PFA = 0%. <br />Leak 2.5 gph. <br />Threshold A pipeline system should not be declared tight if the test result indicates a loss that equals or exceeds this <br />threshold. <br />Applicability Gasoline, diesel, aviation fuel. <br />Calibration Equipment must be checked annually for capability of detecting a line leak of 3.0 gph and, if <br />necessary, calibrated in accordance with manufacturer's instructions. <br />Comments Functionality and operability of the 99 LD -2000 and 99 LD -2200 are unchanged by installation of the Leak <br />Detection Sensor (piston switch) that supports the VMI ISM -4080 and ISM -4081 Integrated Shutdown <br />Module. <br />Vaporless Manufacturing Evaluator: Ken Wilcox Associates <br />8700 East Long Mesa Drive Tel: (816) 443-2494 <br />Prescott Valley, AZ 86314 Dates of Evaluation: 05/20/98, 11/10/98 <br />Tel: (928) 775-5191 <br />http://www.waterboards.ca.gov/water issues/programs/ust/leak_prevention/lgl13/vendors/vaporless_manu... 4/1/2010 <br />Other liquids may be tested after consultation with the manufacturer. <br />Specification <br />System tests pressurized flexible, fiberglass, and steel pipelines. <br />Tests are conducted at operating pressure. <br />Pipeline <br />Maximum of 172 gallons for rigid pipelines. <br />Capacity <br />Maximum of 39.5 gallons for flexible pipelines. <br />Waiting Time <br />None between dispensing and testing. <br />None between delivery and testing. <br />Test Period <br />Response time is less than 1 minute without a leak and 1 to 8 minutes with a leak. <br />System <br />Permanent installation on pipeline. <br />Features <br />Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Restricted flow to dispenser if leak is declared. <br />Calibration Equipment must be checked annually for capability of detecting a line leak of 3.0 gph and, if <br />necessary, calibrated in accordance with manufacturer's instructions. <br />Comments Functionality and operability of the 99 LD -2000 and 99 LD -2200 are unchanged by installation of the Leak <br />Detection Sensor (piston switch) that supports the VMI ISM -4080 and ISM -4081 Integrated Shutdown <br />Module. <br />Vaporless Manufacturing Evaluator: Ken Wilcox Associates <br />8700 East Long Mesa Drive Tel: (816) 443-2494 <br />Prescott Valley, AZ 86314 Dates of Evaluation: 05/20/98, 11/10/98 <br />Tel: (928) 775-5191 <br />http://www.waterboards.ca.gov/water issues/programs/ust/leak_prevention/lgl13/vendors/vaporless_manu... 4/1/2010 <br />