Laserfiche WebLink
OA'gUt/y C � • <br />SAN JOAQUIN COUNTY <br />w; { ENVIRONMENTAL HEALTH DEPARTMENT <br />:. 600 East Main Street, Stockton, CA 95202-3029 <br />Y. <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />•9C%FOiRta <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facili Name: <br />Inspecti n Date: <br />1.� <br />� <br />1� <br />Facility Addr ss: <br />Service Req st M <br />On ite Servide Technician's a <br />ICC Service Technician/Ins Iter Exp. Date: <br />Manuf ct rer Training: <br />❑ <br />Leak detector <br />❑ <br />SERVICE <br />Leak detector <br />O&W <br />❑ <br />echanical Model: VH( <br />THIS FACILITY IS SUBJECT TO REINSPECTION AATANY TIME AT EHD'S CURRENT HOURLY RATE. <br />electronic Serial #: <br />Received By: '\ Q �� <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />THIS FACILITY IS SUBJECT TO REINSPECTION AATANY TIME AT EHD'S CURRENT HOURLY RATE. <br />❑ Caldwell System ❑ Other <br />Received By: '\ Q �� <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 20 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />EHD 2 4 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />THIS FACILITY IS SUBJECT TO REINSPECTION AATANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector: <br />Received By: '\ Q �� <br />Title: <br />EHD 2 4 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />